한중플랜트
Business Area
Engineering
Manufacturing
Construction
Technical Management
Introduction of Technology
Facility status
Business Performance
Domestic Performance
Overseas Performance
Company Introduction
Introduction of Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer Support
Notice
Recruitment Information
Q&A
주메뉴
Business Area
Engineering
Manufacturing
Construction
Technical Management
Introduction of Technology
Facility status
Business Performance
Domestic Performance
Overseas Performance
Company Introduction
Introduction of Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer Support
Notice
Recruitment Information
Q&A
Business
Area
Engineering
Manufacturing
Construction
Technical
Management
Introduction of
Technology
Facility status
Business
Performance
Domestic
Performance
Overseas
Performance
Company
Introduction
Introduction of
Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer
Support
Notice
Recruitment
Information
Q&A
PERFORMANCE
Domestic
Overseas
Domestic Performance
HOME
Business Performance
Domestic Performance
Construction period
2019~Present
2015~2018
2013~2014
2010~2012
2007~2009
2005~2007
2001~2004
Taean IGCC C-1701B Derailment Installation Work
2019.11~2020.06
Support for the dismantling, installation, and commissioning of Phase I,II of large GT test buildings
2020.06~
Taean IGCC Gasification Plant (HP Economizer Installation Works)
2019.07~2020.01
[Youngheung#4] Seperator Hemi Head Replacement Work
2020.04~2020.06
Yeongheung#4 Duct Replacement Work
2020.04
Taean PKG2 Drag Chain Replacement
20.05.25~20.12.31
Boryeong #7,8 Boiler FRH Tube Bundle Replacement Work
20.07.02~21.06.18
Taean IGCC C-1701B Skimmed Installation Construction
19.11.29~20.07.30
Support for dismantling, installation and commissioning of large GT test buildings Phase I and II
20.03.20~22.01.28
Gas Turbine and Gas Turbine Accessories for Gimpo Thermal Power Plant Purchase GPKG#1,2 Gas Turbine and Accessories Installation Construction
21.10.29~23.07.30
Taean #7,8 Boiler FSH & FRH Tube Replacement Work
21.10.07~23.05.30
Yeongheung No. 1 boiler FSH Inlet HDR Conn. Tube replacement work
21.08.23~22.04.30
Waste Heat Boiler Water Pipe Replacement at Mapo Resource Recovery Facility
22.07.29~22.11.20
Replacement of water pipe for boiler room 1 of Yangsan Resource Recovery Facility Unit 2
22.02.15~22.04.05
Large GT FSFL Factory Repair Work_1
22.09.27~23.08.30
Construction of Changwon Hydrogen Liquefaction Plant (Machine and Piping Installation)
22.01.14~22.12.31
Replacement of Boiler FSH Outlet HDR Loose Tube for Yeongheung Unit 1 and 2
22.05.16~22.11.11
Purchasing steam turbines, HRSG and Power Block of Gimpo Thermal Power Plant (PKG#2 Steam Turbine and Accessories Installation Work)
21.10.29~23.07.31
all
Construction
Production
Field
Construction name
Construction period
Original building
Construction
GS Donghae Electric Power Unit 1 Turbine Reheated Steam Piping Leakage Work
22.04.28~22.05.06
GS Donghae Electric Power Co., Ltd
Construction
GS Donghae Power #1,2 boiler tube reinforcement and valve replacement Corporation
22.04.11~22.05.08
GS Donghae Electric Power Co., Ltd
Construction
Jeonju WinPower Boiler Tube Repair Work (BioSTG2)
22.02.15~22.04.05
Jeonju Win Power Co., Ltd
Construction
Water pipe replacement work for unit 2 boiler 1 of Yangsan Resource Recovery Facility
22.02.15~22.04.05
POSCO O&M Co., Ltd
Construction
New Boryeong #2 FRH Shortened Platedn SH Tube Replacement Subcontracting
22.03.04~22.05.22
NS System Co., Ltd
Construction
Water pipe replacement of waste heat boiler at Mapo resource recovery facility
22.07.29~22.11.20
Hanjong Industrial Development Co., Ltd
Construction
Yeongheung Unit 1 Boiler FSH Inlet HDR Conn. Tube Replacement Work
21.08.23~22.04.30
Doosan Energy Co., Ltd
Construction
Taean #7,8 Boiler FSH & FRH Tube Replacement Work
21.10.07~23.05.30
Doosan Energy Co., Ltd
Construction
Purchase of gas turbines and gas turbines of Gimpo combined power plant; Installation of gas turbines and attached facilities of GPKG#1,2
21.10.29~23.07.30
Doosan Energy Co., Ltd
Construction
Bio #2 Boiler Tube Repair Work
21.07.14~21.12.28
Jeonju WinPower Co., Ltd
Construction
Yangsan Resource Recovery Facility Unit 1 Boiler 1 Water Pipe Replacement Construction
21.09.01~21.10.08
POSCO O&M Co., Ltd
Construction
DongHae Biomass Boiler Furnace Replacement Work
21.08.23~21.10.22
Susan Industries Co., Ltd
Construction
[Taean IGCC '21 Maintenance] PKG9 Drag Chain and Vibrating Screen Replacement
21.05.21~21.12.17
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Replacement of boiler FRH tube of Yeongheung #3
21.03.08~21.05.18
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Yangsan Resource Recovery Facility Unit 1 Boiler Unit 2 Water Pipe Replacement Work
21.02.19~21.03.15
POSCO O&M Co., Ltd
Construction
Support for the dismantling, installation, and commissioning of large GT test buildings Phase I and II
20.03.20~22.01.28
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Installation of IGCC C-1701B Degreaser in Taean
19.11.29~20.07.30
Doosan Heavy Industries & Construction Co., Ltd.
Construction
DongHae Biomass Boiler Tube Replacement Work
20.09.12~20.11.10
Susan Industries Co., Ltd
Construction
Boryeong #7,8 Boiler FRH Tube Bundle Replacement Work
20.05.25~20.12.31
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Replacement of the Taean PKG2 Drag Chain
20.05.25~20.12.31
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Replacement of Youngheung #4Duct
20.04.29~20.07.30
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Yeongheung #4 Seperator Hemi Head Replacement Construction
20.04.01~20.07.30
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Shin Boryeong #2 HP Bypass Repair Work
20.03.06~20.06.24
㈜신동아이엠에스
Construction
2020 Air Force Unit 2 Turbine Electrical Equipment Class A Planned Preventive Maintenance Work
2020.03
Korea Western Power Co., Ltd.
Construction
2020 Shin Boryeong Unit 2 Planned Preventive Maintenance Project (Boiler Facility)
2020.03~2020.05
Shindong IMS Co., Ltd.
Construction
Phase I,II dismantling, installation and commissioning support for large GT test building
2020.06~
Doosan Heavy Industries & Construction Co., Ltd.
Construction
[Youngheung#4] Seperator Hemi Head Replacement Work
2020.04~2020.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean #9 BFPT-A Dish. Replace Check Valve
2020.04~2020.05
KEPCO KPS Co., Ltd.
Construction
Yeongheung#4 Duct Replacement Work
2020.04
Doosan Heavy Industries & Construction Co., Ltd.
Construction
PKG2 Drag Chain Replacement and Emergency Outlet Establishment
2020.05.~2020.07
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Pukpyeong #1 SH Spray Valve Drain Line Construction Work
2019.03~2019.04
Fisheries Industries Co., Ltd.
Construction
Installation of the minimum flow valve at Bukpyeong Unit 1
2019.05~2019.05
GS Donghae Electric Power Co., Ltd.
Construction
Taean #2 Boiler Main Steam Piping Damage Maintenance
2019.11~2019.11
Korea Western Power Co., Ltd.
Construction
Outsourcing Maintenance of Cracks in HRH Pipe of Pyeongtaek Thermal Power Plant #2
2019.11~2019.11
Korea Western Power Co., Ltd.
Construction
HRH Pipe Maintenance for Pyeongtaek Energy Units 1 and 2
2019.12~2019.12
Korea Western Power Co., Ltd.
Construction
Taean IGCC C-1701B Derailment Installation Work
2019.11~2020.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Biomass donghae eva wing wall the purchase
2019.12~2020.03
Korea East-West Power Co., Ltd.
Construction
Buy thermal biomass superheater tube donghae
2019.12~2020.09
Korea East-West Power Co., Ltd.
Construction
Yeongheung#3 HRH Spool Pipe Replacement Work
2019.02~2019.03
Korea South-East Power Co., Ltd.
Construction
Yeongdong Thermal Power #1 Fuel conversion facility (manufacturing and installing convenience facilities for meter access)
2019.02~2019.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Yeongheung Thermal Power Co., Ltd. #2 Ring Header Connection Tube
2019.03~2019.07
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Sin Boryeong #1 HP Bypass Valve Repair Work
2019.04~2019.05
Korea Midland Power Co., Ltd.
Construction
Taean IGCC Gasification Plant (2019 OH Corporation)
2019.04~2019.11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Yeongdong Thermal Power Plant #2_MCC Room / Electronic Equipment Room Reinforcement Work
2019.05~2019.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean IGCC 19 years maintenance repair welding
2019.06~2019.09
Doosan Heavy Industries & Construction Co., Ltd.
Construction
[Shin Bo-ryeong #1,2] Removing the sleeve in the boiler PH & repairing the spring nozzles
2019.04~2019.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean IGCC Gasification Plant (HP Economizer Installation Works)
2019.07~2020.01
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Biomass donghae WTR wall tube a replacement.
2019.07~2019.09
Fisheries Industries Co., Ltd.
Construction
Taean IGCC X-1701 A,B Conveyor Installation Works
2019.11~2019.12
Korea Western Power Co., Ltd.
Construction
HRH Pipe Maintenance Works for Energy Units 1 and 2
2019.11~2019.11
Korea Western Power Co., Ltd.
Construction
Yeongheung Thermal Power Plant #2 (Boyler FSH Inlet Header. Tube Replacement)
2019.04~2019.07
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean IGCC 'Planning Preventive Maintenance' (HPHT Filter Inspection)
2019.06~2019.09
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean IGCC Sanseong Slurry Debris Installation Works
2019.07~2019.08
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Units 7 and 8 boiler FSH In-Outlet Tube Bundle Replacement Work
2018.07~2019.07
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Outsourcing Service for Modifying Attemperator 1st & 2nd Stage of Shin Boryeong Unit 2
2018.09~2018.11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean IGCC Desalination Facility Emergency Repair Work
2018.10~2018.10
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong #7,8 boiler FSH Outlet Bundle Replacement Work
2017.12~2019.07
Doosan Heavy Industries & Construction Co., Ltd.
Production
[Shin Bo-ryeong #2] Boiler Pri during the OH period. SH Tube Corrective Operation Service
2020.06
Doosan Heavy Industries & Construction Co., Ltd.
Production
[Shin Bo-ryeong #1,2] Three on-site modification work during OH period of Unit 2 (Boiler Pressure Division,GAH Section)
2020.03
Doosan Heavy Industries & Construction Co., Ltd.
Production
[Gangneung Anin #1,2] Outsourcing service for technical support of boiler pressure
2020.04
Doosan Heavy Industries & Construction Co., Ltd.
Production
Self-restraint purchase of electric dust collector for North Peace Power Plant No. 1
2019.01~2019.02
GS Donghae Electric Power Co., Ltd.
Production
Five types of purchase other than Pipes
2019.03~2019.04
GS Donghae Electric Power Co., Ltd.
Production
Purchase of North Peace Power Boiler Tube Protector
2019.03~2019.04
GS Donghae Electric Power Co., Ltd.
Production
Outsourcing the Crank Set of DE Chuta System for Unit 1 Electrostatic Precipitator
2019.12~2019.12
GS Donghae Electric Power Co., Ltd.
Production
North Korean Peace Force Furnace Nose Wall Tube Protector Production
2019.02~2019.02
Fisheries Industries Co., Ltd.
Production
East Sea inside # 2 fbac clinkek, and refractories, tube protector
2019.04~2019.04
Fisheries Industries Co., Ltd.
Production
East Sea two # 1 oh protector
2019.05~2019.06
KEPCO KPS Donghae
Production
East Sea # 1 oh the protector
2019.05~2019.06
KEPCO KPS Donghae
Production
Samcheok. Outsourcing tube and membrane
2019.06~2019.06
Korea Southern Power Co., Ltd.
Production
Furnace Fluidzing Air Nozzle
2019.07~2019.08
KEPCO SPC POWER COPRATION
Production
Furnace Fluidzing Air Nozzle (200pc)
2019.09~2019.10
KEPCO SPC POWER COPRATION
Production
Purchase of Tube Bundle for Wonju 1st Superheater
2019.06~2020.03
Korea Midland Power Co., Ltd.
Production
Biomass donghae furnace wtr wall production supply design tube
2019.07~2019.07
Korea East-West Power Co., Ltd.
Production
Boiler supply for Units 9 and 10 of Dangjin Thermal Power Plant
2019.09~2019.11
Daelim Industrial Co., Ltd