한중플랜트
Business Area
Engineering
Manufacturing
Construction
Technical Management
Introduction of Technology
Facility status
Business Performance
Domestic Performance
Overseas Performance
Company Introduction
Introduction of Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer Support
Notice
Recruitment Information
Q&A
주메뉴
Business Area
Engineering
Manufacturing
Construction
Technical Management
Introduction of Technology
Facility status
Business Performance
Domestic Performance
Overseas Performance
Company Introduction
Introduction of Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer Support
Notice
Recruitment Information
Q&A
Business
Area
Engineering
Manufacturing
Construction
Technical
Management
Introduction of
Technology
Facility status
Business
Performance
Domestic
Performance
Overseas
Performance
Company
Introduction
Introduction of
Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer
Support
Notice
Recruitment
Information
Q&A
PERFORMANCE
Domestic
Overseas
Domestic Performance
HOME
Business Performance
Domestic Performance
Construction Period
2019~Present
2015~2018
2013~2014
2010~2012
2007~2009
2005~2007
2001~2004
[South jeju thermal power plant] DUCT Design Supply
2004.04~2004.12
[POSCO] array boiler REPLACEMENT
2004.06~2004.09
all
Construction
Field
Construction name
Construction period
Original building
Construction
Design Service of Youngnam Thermal Power Plant DUCT
2004.10
Daeheunggi Gong Co., Ltd.
Construction
ISO drawing of PG 1 sintering array recovery facility piping
2004.10
Bumwoo ENG Co., Ltd.
Construction
In addition to the construction of INSULATION for Aju Metal New Plant
2004.10
Great Oil Pressure
Construction
Aju Metal Coolant Insulation Work and Other
2004.10
sincere machine
Construction
Southern Jeju#3,4 BLR DUCT Design Service
2004.09-2004.12
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Repair of Boryeong Complex #7 BLR TUBE LEAK
2004.07
ENG.Service
Construction
POSCO S/STEEL Design service
2004.07
Bumwoo ENG Co., Ltd.
Construction
PG 1 Demolition/Installation of the old replacement of the sintering array recovery facility
2004.06-2004.09
Bumwoo ENG Co., Ltd.
Construction
Seocheon Thermal Power Plant #1 SLOPE TUBE PANEL Replacement Work
2004.03
Bumwoo ENG Co., Ltd.
Construction
Processing of Dangjin #5 TURBINE DIAPHARM
2004.1
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Yeongheung A/H BRG Welding Work
2003.12
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Glory#5,6 Replacement of ELBOW
2003.12
Sungkwang Band Co., Ltd.
Construction
Boryeong Complex#1 Repairing HRSG HP SH HDR TUBE
2003.12
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Complex#7,8 HRSG O/H Repair
2003.12
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean #5 Repairing the Temperature Sensing System of Non-Pass Gas
2003.12
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Repairing the TUBE LEAK for Boryeong Complex #7
2003.12
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean #5 Repairing desulfurization OUTLET DAMPER
2003.11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean #6 COAL BURNER Repair and Exception
2003.10
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean #6 ERECTION CON. FOR BRG & VALVE REPAIR
2003.10
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean #6 Fabrication/Installation of desulfurized DMPR P/FORM & LADDER
2003.10
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean #6 De-sulfurization GGH GUIDE TRUNNION SHAFT/BRG Replacement Work
2003.10
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean #6 Desulfurization DAMPER Repair Operation
2003.09
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Demolition/installation of old replacement of PG 2 sintering array recovery facility
2003.08-2004.02
Bumwoo ENG Co., Ltd.
Construction
East Sea of # 1, 2 bp wall but Remedial work and equipment replaced.
2003.06-2003.08
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean #5 BLR DRIP SHIELD Deformation Exception
2003.03
Doosan Heavy Industries & Construction Co., Ltd.
Construction
East Sea of # 1, 2 wall ring and tube header.
2003.03
Doosan Heavy Industries & Construction Co., Ltd.
Construction
East Sea of # 1, 2 wall ring and tube header East Sea # 1 blr hdr and remuneration tube
2003.01
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong Thermal Power #6 Other than Repair of DAMPER
2002.11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Dangjin#4 WINDBOX UNDULATED PLATE Repair
2002.10
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Excluding Dangjin #4 BLR BURNER NOZZLE TIP
2002.10
Doosan Heavy Industries & Construction Co., Ltd.
Construction
SANPEDRO HRSG STACK thermal insulation works
2002.09-2003.01
Doosan Heavy Industries & Construction Co., Ltd.
Construction
ADVANCED VORTEX BLADE Turbine Experimental Unit Piping
2002.09
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Complex#1-8 HRSG OUTSTANDING ITEM Modification
2002.07
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong Thermal Power Plant #4 Demolition of desulfurization and desorption experimental facilities
2002.07
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Donghae h and fire # 1, 2 r tube the Repair Work.
2002.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Repair besides BLR DESH SPRAY NOZZLE for seismic power #3
2002.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Repair other than the TIP of the BLR BURNER NOZZLE TIP
2002.04
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Complex#1-8 HRSG BAFFLE PLATE Reinforcement
2002.03
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Donghae r h, and fire # 1, 2 s h tube and complementary work replaced.
2002.03
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Produce and install Boryeong Complex#1-8 HRSG HDR DRAIN LINE
2001.11-2002.2
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Production and installation of HRSG STACK DMPR for Hallym Complex #1,2
2001.11
Doosan Heavy Industries & Construction Co., Ltd.