PERFORMANCE

Overseas Performance

  • HOME
  • Business Performance
  • Overseas Performance

Construction Period

  • Field

    Construction name

    Construction period

    Original building

  • Production

    Separator Pipe for Boiler Unit 1 & 2 A class OH

    2023.08.03

    KEPCO SPC POWER CORPORATION

  • Production

    Furnace Wall Tube Boiler U1 & U2 OH A class

    2023.07.04

    KEPCO SPC POWER CORPORATION

  • Construction

    SUPPLY OF LABOR AND CONSUMBALE MATERIALS FOR THE REPAIR AND NORMALIZATION OF UNIT 1 LPBP THROUGH PARTIAL PIPE AND FITTINGS REPLACEMENT

    2023.08.02~2023.09.08

    KEPCO SPC POWER CORPORATION

  • Construction

    REPLACEMENT OF REHEATER 1 OUTLET HEADER CONNECTION TUBE, SLEEVE AND MEMBRANE (LABOR AND CONSUMABLE MATERIALS) FOR THE “A” CLASS PLANNED OVERHAUL OF BOILER UNITS 1 AND 2

    2023.08.02~2023.10.18

    KEPCO SPC POWER CORPORATION

  • Construction

    SUPPLY OF LABOR AND MATERIALS FOR THE REPLACEMENT OF FURNACE WALL TUBE FOR BOILER UNITS 1 AND 2 FOR CLASS A OVERHAUL

    2023.08.06~2023.10.14

    KEPCO SPC POWER CORPORATION

  • Production

    RH1 Outlet Header Connection Tubes for Boiler U1 & U2

    2022.03.07~2022.07.15

    KEPCO SPC POWER CORPORATION

  • Production

    #11,12 HRSG LP EVA FINNED TUBE

    2022.03.07

    KOREA SOUTHREN POWER/Jordan

  • Production

    Sliding connedtor Platen SH FEMALE SC-2 etc

    2021.11.24

    AES MONG DUONG POWER CO. LTD.

  • Production

    Reheater 2 Outlet Header Stub Tubes for Boiler Unit 1&2

    2021.02.17

    KEPCO SPC POWER CORPORATION

  • Construction

    BOILER UNIT 1&2 - RH2 OUTLET HEADER STUB REPALCEMENT WORKS AND ALIGNMENT OF HEADER TO LINK

    2021.05.01~2022.07.01

    KEPCO SPC POWER CORPORATION

  • Construction

    BOILER UNIT 1&2 - RH1 OUTLET HEADER STUB REPALCEMENT WORKS AND ALIGNMENT OF HEADER TO LINK PIPE

    2020.06.27~2020.09.18

    KEPCO SPC POWER CORPORATION

  • Construction

    UNIT 1&2-RH OUTLET HDR STUB Replacement Works AND ALIGNMENT OF HDR TO LINK PIPE

    2020.08-2020.09

    KEPCO SPC POWER CORPORATION

  • Construction

    Cebu 1 and 2 RH1 Stub Tube Repair Welding

    2019.09~2019.11

    KEPCO SPC POWER CORPORATION

  • Construction

    RH1 Outlet HDR Stubs & Furnace Front Wall Tube Panel for BLR U1 & U2 (Production)

    2019.09~2019.11

    KEPCO SPC POWER CORPORATION

  • Construction

    Botswana (crack repair work for additional piping work)

    2019.04~2019.08

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Saudi(Fadhili Combined Heat and Power Project)

    2019.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Cirebon LTSH Replacing self-restraint with tubes

    2019.12~2020.01

    PT. Cirebon Electric Power

  • Construction

    JORDAN HRSG tube repair

    2019.02~2019.02

    KOSPO/JORDAN L.L.C.

  • Construction

    Saudi Padhili Combined Firepower-Boyler Tube Repair

    2019.04~2019.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Cirebon Steam Blowing Piping Replacement Work

    2019.09~2020.01

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Cebu Boiler#1 - Reheater1 Oulet Header Stub welding Modification Work

    2018.02~2018.03

    KEPCO SPC Corporation

  • Construction

    Cebu Boiler#2 - Reheater1 Oulet Header Stub welding Modification Work

    2018.04~2018.04

    KEPCO SPC Corporation

  • Construction

    Detailed KSPC Power Plant Units 1 and 2 boiler tube coil Replacement Work

    2018.10~2019.02

    KEPCO SPC Corporation

  • Construction

    Ilian HRSG 1-2 Primary Evaporator Header Outlet Atmosphere Assembly Replacement

    2019.09~2019.10

    KEPCO IlijanCorporation